Re-Commissioning
Through commissioning, we provide a method of risk reduction for new construction projects. Given the opportunity, our team follows the construction process from pre-design through construction and acceptance. By doing so, we can ensure that building systems meet the design intent and that the building owner is provided with what he or she expects.
Pre-Design Phase
- Hire commissioning provider
- Develop commissioning requirements
Design Phase
- Review design intent
- Write commissioning specifications
Construction Phase
- Review documentation
- Develop pre-test checklists
Acceptance Phase
- Execute tests and diagnostics
- Find deficiencies
- Re-test and monitor as needed
Post-Acceptance Phase
- Prepare final report
- Develop recommissioning plan